  1. Prerequisites
  2. The Hook: Two Cyclones, Two Outcomes
  3. 1. The Vocabulary
  4. 2. Classifying Hazards
  5. 3. India’s Hazard Profile
  6. 4. The Major Hazards
  7. 5. The Disaster Management Cycle
  8. 6. India’s Institutional Framework
  9. 7. International Frameworks
  10. 8. Mitigation Strategies at a Glance
  11. Memory Tricks
  12. Don’t Confuse
  13. Common Mistakes
  14. Practice
  15. Quick Revision Table
  16. Key Takeaways
  17. What’s Next

Prerequisites

The Hook: Two Cyclones, Two Outcomes


1. The Vocabulary

TermMeaning
HazardA potentially damaging natural or human-made event or phenomenon (an earthquake, a cyclone, a chemical leak)
DisasterA serious disruption of a community’s functioning, with human, material, economic or environmental losses that exceed the community’s ability to cope using its own resources
VulnerabilityConditions (physical, social, economic, environmental) that make a community more susceptible to harm: weak houses, poverty, poor roads, no warning system
ExposurePeople and assets located in harm’s way
CapacityStrengths and resources a community has to resist, cope and recover
ResilienceAbility to absorb, adapt to and recover from a hazard’s effects quickly
RiskThe likelihood of losses from the interaction of hazard and vulnerability

The standard relation, used in many textbooks:

$$\text{Risk} = \frac{\text{Hazard} \times \text{Vulnerability}}{\text{Capacity}}$$

Risk falls if vulnerability falls or capacity rises, even when the hazard itself cannot be changed. That is the logic of all mitigation.


2. Classifying Hazards

CategoryHazards
Geological (geophysical)Earthquakes, tsunamis, volcanic eruptions, landslides and mudflows
Hydro-meteorologicalFloods, cyclones, droughts, cloudbursts, heat waves, cold waves, lightning, hailstorms, avalanches
Climatological / long-termDesertification, sea-level rise, glacier retreat, glacial lake outburst floods (GLOFs)
BiologicalEpidemics and pandemics (COVID-19), pest attacks (locusts), animal diseases
Human-made (technological)Industrial accidents (Bhopal, 1984), nuclear accidents (Chernobyl, 1986), fires, building collapses, oil spills, stampedes

Hazards are also classed by speed: rapid-onset (earthquake, flash flood, cyclone) vs slow-onset (drought, desertification, sea-level rise).


3. India’s Hazard Profile

India is among the world’s most disaster-prone countries. The figures most often quoted by the National Disaster Management Authority (NDMA):

HazardExposure
EarthquakesAbout 58.6% of the landmass prone to earthquakes of moderate to very high intensity
FloodsOver 40 million hectares (about 12% of land) flood-prone
Cyclones and tsunamisAbout 5,700 km of the roughly 7,500 km coastline
DroughtAbout 68% of the cultivable area
LandslidesHilly regions of the Himalaya and the Western Ghats

Earthquake zones

The Bureau of Indian Standards’ seismic code (IS 1893) long divided India into four zones, II to V, with Zone V the most severe (the north-east, Kashmir, parts of Himachal Pradesh and Uttarakhand, the Rann of Kutch, Bihar’s Nepal border belt and the Andaman and Nicobar Islands). A 2025 revision of the code proposed a redrawn map, but its status has since been disputed (it was reported withdrawn in 2026); check the current BIS edition before quoting zone boundaries.


4. The Major Hazards

Earthquakes

ConceptMeaning
Focus (hypocentre)Point inside the Earth where the rupture starts
EpicentrePoint on the surface directly above the focus; usually the worst shaking
Seismic wavesP-waves (primary, fastest, pass through solids and liquids), S-waves (secondary, solids only), surface waves (slowest, most destructive)
SeismographInstrument that records the waves
MagnitudeEnergy released; Richter scale (Charles Richter, 1935), now generally replaced by the moment magnitude scale; logarithmic
IntensityEffects at a place (damage, what people feel); Modified Mercalli scale, I to XII

Richter arithmetic: one whole step in magnitude means 10 times the ground-motion amplitude and about 31.6 (roughly 32) times the energy, because energy scales as \(10^{1.5}\) per step.

Notable Indian earthquakes: Latur (Maharashtra, 1993), Bhuj (Gujarat, 26 January 2001), Kashmir (2005), Sikkim (2011).

Mitigation: earthquake-resistant building codes (IS 1893, IS 4326, IS 13920) and their enforcement; retrofitting schools and hospitals; land-use zoning; public drills (“drop, cover, hold on”).

Tsunamis

Long ocean waves caused mainly by undersea earthquakes (also landslides and volcanoes). In the open ocean they are low and fast; they rise to great heights in shallow coastal water. The 26 December 2004 Indian Ocean tsunami, from an earthquake off Sumatra, struck Tamil Nadu, Andaman and Nicobar and other coasts. India then set up the Indian Tsunami Early Warning Centre at INCOIS, Hyderabad (operational from 2007). Mangroves and coastal forests act as natural buffers.

Cyclones

Tropical cyclones form over warm seas (surface water above about 26–27 °C) and rotate anticlockwise in the northern hemisphere (clockwise in the southern). The calm centre is the eye. Most deaths come from the storm surge, not the wind.

The India Meteorological Department (IMD) classifies systems in the north Indian Ocean by maximum sustained wind speed:

CategoryWind speed (knots)
Depression17–27
Deep depression28–33
Cyclonic storm34–47
Severe cyclonic storm48–63
Very severe cyclonic storm64–89
Extremely severe cyclonic storm90–119
Super cyclonic storm120 and above

Cyclones in the region are named from a list prepared by the member countries of the WMO/ESCAP Panel on Tropical Cyclones, with IMD New Delhi as the regional specialised centre. The east coast (Bay of Bengal) is hit far more often than the west coast (Arabian Sea).

Mitigation: early warning and colour-coded alerts, multipurpose cyclone shelters, evacuation plans, mangrove and shelterbelt plantation, cyclone-resistant housing, the National Cyclone Risk Mitigation Project.

Floods

TypeCauseExample
RiverineHeavy monsoon rain; silted, shifting riversKosi ("Sorrow of Bihar"); Brahmaputra in Assam
Flash floodsIntense rain in a short time, often a cloudburstKedarnath, 2013 (with a glacial-lake breach)
UrbanPaved surfaces, blocked drains, encroached lakes and wetlandsMumbai 2005, Chennai 2015
CoastalStorm surge, tsunami1999 Odisha

Mitigation: structural (embankments, dams, channel improvement, drainage) and non-structural (flood-plain zoning, flood forecasting by the Central Water Commission, flood insurance, protecting wetlands that store water, watershed management upstream).

Droughts

TypeMeaning
MeteorologicalRainfall well below normal
HydrologicalReduced surface and groundwater (rivers, reservoirs, aquifers)
AgriculturalSoil moisture too low for crops
Socio-economicShortfall affects livelihoods, food and water supply

A drought builds in this order: meteorological → agricultural → hydrological → socio-economic.

Mitigation: rainwater harvesting, watershed development, check dams, drought-resistant crops, micro-irrigation (drip and sprinkler), crop insurance, employment guarantees (MGNREGA works on water conservation).

Landslides

Downslope movement of rock, soil and debris, triggered by heavy rain, earthquakes, and human causes such as road cutting on slopes, deforestation and quarrying. Most common in the Himalaya, the Western Ghats and the north-east. Mitigation: hazard zonation maps, retaining walls, drainage of slopes, afforestation, restricting construction on unstable slopes.

Heat waves

The IMD declares a heat wave when the maximum temperature reaches at least 40 °C in the plains (37 °C on the coast, 30 °C in hilly regions) and is well above normal. Cities are hotter because of the urban heat island effect. Mitigation: Heat Action Plans (the first in South Asia was prepared by Ahmedabad in 2013), early warnings, cool roofs, drinking-water points, shifting outdoor work hours.


5. The Disaster Management Cycle

graph LR
    A["Mitigation
reduce risk before"] --> B["Preparedness
plans, drills, warnings"] B --> C["Disaster event"] C --> D["Response
rescue, relief, first aid"] D --> E["Recovery
rehabilitation, reconstruction"] E --> A
PhaseWhenExamples
MitigationLong beforeBuilding codes, zoning, embankments, mangrove belts, insurance
PreparednessBeforeEarly warning systems, evacuation plans, stockpiles, mock drills, training community volunteers
ResponseDuring and just afterSearch and rescue, evacuation, medical aid, food, water, shelter
RecoveryAfterRehabilitation (restoring services, livelihoods) and reconstruction (rebuilding), ideally “Build Back Better”

Mitigation and preparedness together are pre-disaster (proactive) phases; response and recovery are post-disaster (reactive) phases. Modern policy, Indian and international, has shifted from a relief-centric approach to a proactive, risk-reduction approach.

Structural and non-structural mitigation

Structural (physical construction)Non-structural (policy, knowledge, behaviour)
Dams, embankments, sea wallsLand-use and flood-plain zoning
Cyclone sheltersBuilding codes and their enforcement
Earthquake-resistant buildings, retrofittingEarly warning and public awareness
Check dams, retaining wallsInsurance and risk transfer
Drainage systemsCommunity training, school safety programmes, mock drills

6. India’s Institutional Framework

The Disaster Management Act, 2005, passed after the 2004 tsunami, created a three-tier structure.

LevelBodyChaired by
NationalNational Disaster Management Authority (NDMA)Prime Minister
StateState Disaster Management Authority (SDMA)Chief Minister
DistrictDistrict Disaster Management Authority (DDMA)District Collector / District Magistrate (the elected head of the local authority is co-chairperson)

Other bodies and instruments:

  • National Executive Committee, chaired by the Union Home Secretary; the Ministry of Home Affairs is the nodal ministry for disaster management (except drought, handled by the Ministry of Agriculture).
  • National Disaster Response Force (NDRF): a specialised response force formed under the Act (constituted in 2006); states have State Disaster Response Forces (SDRFs).
  • National Institute of Disaster Management (NIDM), New Delhi: training and research.
  • National Policy on Disaster Management, 2009; National Disaster Management Plan (NDMP), first released in 2016 (the first national plan aligned with the Sendai Framework), revised in 2019.
  • Disaster Management (Amendment) Act, 2025 made the NDMA and SDMAs themselves prepare the national and state disaster management plans (earlier drafted by the executive committees), and provided for national and state disaster databases and for Urban Disaster Management Authorities in large cities.
  • Funds: National and State Disaster Response Funds and Mitigation Funds, as recommended by the Finance Commission.
  • Aapda Mitra: a scheme training community volunteers as first responders.

7. International Frameworks

FrameworkPeriodKey point
International Decade for Natural Disaster Reduction1990sUN decade that put disaster reduction on the global agenda
Yokohama Strategy1994First global plan for a safer world
Hyogo Framework for Action2005–2015Adopted in Kobe, Hyogo (Japan) after the 2004 tsunami; “building the resilience of nations and communities”
Sendai Framework for Disaster Risk Reduction2015–2030Adopted at Sendai, Japan, in March 2015; 7 global targets and 4 priorities

The Sendai Framework’s four priorities

  1. Understanding disaster risk
  2. Strengthening disaster risk governance to manage disaster risk
  3. Investing in disaster risk reduction for resilience
  4. Enhancing disaster preparedness for effective response and to “Build Back Better” in recovery, rehabilitation and reconstruction

Its seven targets aim to reduce mortality, the number of people affected, economic loss and damage to critical infrastructure, and to increase national and local DRR strategies, international cooperation, and access to early warning systems and risk information. Sendai shifted the focus from managing disasters to managing risk.

India’s international initiative

The Coalition for Disaster Resilient Infrastructure (CDRI) was launched by India at the UN Climate Action Summit, New York, in September 2019. It promotes infrastructure (power, transport, telecom, health) that can withstand disasters. Its secretariat is in New Delhi.


8. Mitigation Strategies at a Glance

HazardKey mitigation strategies
EarthquakeBuilding codes, retrofitting, zoning, drills, seismic monitoring
TsunamiEarly warning (INCOIS), coastal zoning, mangroves, evacuation routes
CycloneIMD warnings, cyclone shelters, mangroves, evacuation, resistant housing
FloodEmbankments, reservoirs, flood-plain zoning, forecasting (CWC), wetland protection
DroughtRainwater harvesting, watershed management, drought-resistant crops, micro-irrigation, insurance
LandslideHazard maps, slope drainage, retaining walls, afforestation, construction limits
Heat waveHeat Action Plans, warnings, cooling shelters, work-hour changes
IndustrialSiting away from settlements, safety audits, on-site and off-site emergency plans, public liability insurance
EpidemicSurveillance, vaccination, sanitation, health-system capacity

Memory Tricks

Don’t Confuse

ThisvsThat
Hazard: potential threatvsDisaster: actual disruption beyond coping capacity
Magnitude (energy; Richter, moment magnitude)vsIntensity (effects; Modified Mercalli, I–XII)
Focus: inside the EarthvsEpicentre: on the surface above it
Mitigation: reduce risk long-termvsPreparedness: get ready to respond
Rehabilitation: restore services, livelihoodsvsReconstruction: rebuild physical structures
Hyogo (2005–2015)vsSendai (2015–2030)
NDMA (PM; policy)vsNDRF (response force) vs NIDM (training, research)
Structural mitigation: buildvsNon-structural: zoning, codes, warnings, insurance
INCOIS (Hyderabad): tsunami warningvsIMD: cyclone warning; CWC: flood forecasting

Common Mistakes


Practice

All questions below are original practice questions written in the UGC NET format. They are not previous-year questions.

Level 1: Foundation

  1. Who chairs the National Disaster Management Authority?
  2. What is the period of the Sendai Framework for Disaster Risk Reduction?
  3. Which scale measures the intensity of an earthquake by its observed effects?
Answers
  1. The Prime Minister.
  2. 2015–2030.
  3. The Modified Mercalli scale (I–XII).

Level 2: Exam-style MCQs

Q1. (Practice) A strong earthquake strikes an uninhabited desert and causes no loss of life or property. This event is best described as:

  • (a) A disaster
  • (b) A hazard but not a disaster
  • (c) A vulnerability
  • (d) A technological disaster
Answer and explanation

(b). A hazard becomes a disaster only when it causes losses that exceed a community’s coping capacity. With no exposure, there is no disaster.

Q2. (Practice) Earthquake A has magnitude 7.0 and earthquake B magnitude 5.0. Approximately how many times more energy does A release than B?

  • (a) 2
  • (b) 100
  • (c) 1,000
  • (d) 10,000
Answer and explanation

(c) 1,000. Energy ratio \(= 10^{1.5 \times 2} = 10^{3}\). Option (b), 100, is the amplitude ratio, the usual trap.

Q3. (Practice) Which of the following are non-structural mitigation measures?

  1. Flood-plain zoning
  2. Construction of embankments
  3. Disaster insurance
  4. Community mock drills

Choose the correct answer from the options given below:

  • (a) 1, 2 and 3 only
  • (b) 1, 3 and 4 only
  • (c) 2, 3 and 4 only
  • (d) 1, 2, 3 and 4
Answer and explanation

(b) 1, 3 and 4 only. Embankments are physical construction, hence structural.

Q4. (Practice) Under the IMD classification, a system with maximum sustained winds of 125 knots is a:

  • (a) Severe cyclonic storm
  • (b) Very severe cyclonic storm
  • (c) Extremely severe cyclonic storm
  • (d) Super cyclonic storm
Answer and explanation

(d) Super cyclonic storm, which begins at 120 knots.

Q5. (Practice) In a district, the hazard level is rated 8, vulnerability 6 and coping capacity 4 on a common index. After a mitigation programme, vulnerability falls to 4 and capacity rises to 6, with the hazard unchanged. Using Risk = (Hazard × Vulnerability) ÷ Capacity, risk falls by about:

  • (a) 33%
  • (b) 44%
  • (c) 56%
  • (d) 67%
Answer and explanation

(c) about 56%. Before: \(8 \times 6 \div 4 = 12\). After: \(8 \times 4 \div 6 \approx 5.33\). Fall \(= (12 - 5.33) \div 12 \approx 0.556\), or about 56%. The hazard never changed; risk fell because vulnerability fell and capacity rose.

Level 3: Assertion–reason, match and sequence

For assertion–reason questions, use these options:

  • (a) Both A and R are true, and R is the correct explanation of A
  • (b) Both A and R are true, but R is not the correct explanation of A
  • (c) A is true, but R is false
  • (d) A is false, but R is true

Q1. (Practice) Assertion (A): Deaths from cyclones on the Odisha coast fell sharply between 1999 and 2013. Reason (R): Better early warning, cyclone shelters and large-scale advance evacuation reduced vulnerability.

Answer and explanation

(a). The hazard was comparable; reduced vulnerability and increased capacity explain the fall.

Q2. (Practice) Assertion (A): The same earthquake can have different Mercalli intensities at different places. Reason (R): An earthquake has one magnitude but its observed effects vary with distance, ground conditions and building quality.

Answer and explanation

(a). Magnitude is one value per event; intensity depends on local effects.

Q3. (Practice) Match List I with List II.

List I (Body / framework)List II (Feature)
A. NDMAI. Tsunami early warning
B. INCOISII. Chaired by the Prime Minister
C. Sendai FrameworkIII. Launched by India in 2019 for resilient infrastructure
D. CDRIIV. Four priorities for action, 2015–2030
  • (1) A-II, B-I, C-IV, D-III
  • (2) A-I, B-II, C-IV, D-III
  • (3) A-II, B-I, C-III, D-IV
  • (4) A-II, B-IV, C-I, D-III
Answer and explanation

(1) A-II, B-I, C-IV, D-III.

Q4. (Practice) Arrange the phases of the disaster management cycle, beginning before the event:

  • A. Response

  • B. Mitigation

  • C. Recovery

  • D. Preparedness

  • (1) B, D, A, C

  • (2) D, B, A, C

  • (3) B, A, D, C

  • (4) D, A, B, C

Answer and explanation

(1) B, D, A, C. Mitigation → preparedness → (disaster) → response → recovery.

Q5. (Practice) Arrange the following international disaster frameworks in chronological order:

  • A. Hyogo Framework for Action

  • B. Yokohama Strategy

  • C. Sendai Framework

  • D. International Decade for Natural Disaster Reduction (start)

  • (1) D, B, A, C

  • (2) B, D, A, C

  • (3) D, A, B, C

  • (4) B, A, D, C

Answer and explanation

(1) D, B, A, C. The decade began in 1990 → Yokohama 1994 → Hyogo 2005 → Sendai 2015.


Quick Revision Table

FactDetail
RiskHazard × Vulnerability ÷ Capacity
Hazard vs disasterPotential event vs disruption beyond coping capacity
ClassesGeological, hydro-meteorological, biological, technological; rapid vs slow onset
India’s exposure (NDMA)About 58.6% earthquake, 12% flood, 5,700 km coast cyclone and tsunami, 68% cultivable area drought
Seismic zonesII–V in IS 1893 (Zone V most severe); status of the 2025 revision disputed
Richter+1 = ×10 amplitude, ×~32 energy; Mercalli I–XII = intensity
Tsunami26 Dec 2004; INCOIS Hyderabad warning centre (2007)
CyclonesAnticlockwise in NH; storm surge kills most; super cyclone ≥ 120 knots; 1999 Odisha, Phailin 2013
FloodsKosi “Sorrow of Bihar”; Kedarnath 2013; CWC forecasts
DroughtMeteorological → agricultural → hydrological → socio-economic
Heat wave≥ 40 °C plains; Ahmedabad Heat Action Plan 2013
CycleMitigation → Preparedness → Response → Recovery
DM Act 2005NDMA (PM), SDMA (CM), DDMA (Collector); NEC (Home Secretary); MHA nodal
OtherNDRF 2006; NIDM; NPDM 2009; NDMP 2016 (revised 2019)
InternationalIDNDR 1990s; Yokohama 1994; Hyogo 2005–15; Sendai 2015–30 (7 targets, 4 priorities)
CDRIIndia, Sept 2019, New Delhi secretariat

Key Takeaways